Portage Community Senior Center

Customer

AVB

Completion Year

2022

Description

The center features a multipurpose room with a capacity to seat 330 people, a courtyard with an outdoor fireplace, an outdoor terrace for warm-weather activities, recreational space for activities such as pickleball and basketball, fitness space, a center promenade for walking, a commercial kitchen, a coffee shop, dedicated space for games and reading and a health clinic.

H& H was proud to be a part of this local community project and install quality vinyl wallcovering for a beautiful accent design to the space.

Advia Credit Union Headquarters - Kalamazoo

Customer

Granger

Completion Year

2021

Description

This 3-story, 300,000 square foot building has the capacity for 460 employees, initially housing approximately 240 employees from 32 departments, accommodating Advia branch banking services, branch retail, banking drive-thru services, ATM, and a night deposit box.

This Unique designed open space concept office building looks clean, sharp, and modern for a great all-around project.

Grand Rapids Home for Veterans

Customer

Christman

Completion Year

2021

Description

The Grand Rapids Home for Veterans is a long-term care state veterans home located on 90 beautifully wooded and landscaped acres near the mighty Grand River. It was originally constructed on this property in 1885 and is one of 152 state veterans’ homes throughout the nation. Initially founded in response to the needs of veterans in the aftermath of the Civil War, GRHV continues the tradition of serving the needs of Michigan’s veterans today, changing and adapting to the needs of the current and future veteran populations.

GRHV has capacity for 450 nursing care beds and more than 100 domiciliary beds. The nursing care beds include 115 special needs beds, with two 35-bed nursing units for the care of Alzheimer's and dementia patients and one 45-bed nursing unit for dual diagnoses patients.

Jackson Public Schools Cascade Elementary

Customer

CSM Group

Completion Year

2021

Description

Painting of a new elementary school that featured multiple accent paint colors throughout the school

Bronson Healthcare – Cafeteria – Battle Creek

Customer

Bronson Healthcare Group

Completion Year

2015

Description

The project consisted of interior painting of a multi-floor renovation.

Grand Rapids Railing

Completion Year

2021

Description

Vapor blasting railings in grand rapids in preparation to apply a new top coat.

Dowagiac District Library

Customer

Miller-Davis Company

Completion Year

2021

Description

This project involved painting the new addition and a complete renovation of the existing library. High-Performance epoxy and urethane coatings were used on exterior handrails and interior stair railings & steel to provide for longer durability.

Coldwater Lakeland 4/5 Elementary

Customer

O.A.K.

Completion Year

2021

Description

Work entailed painting of a new 4th and 5th-grade elementary school including exposed ceilings and accent-colored walls and ceilings.

Docks Unlimited – Floor Prep

Customer

Docks Unlimited

Completion Year

2016

Description

The project entailed shot blasting an old existing concrete floor to remove the existing coating and provide the proper profile, epoxy patching of low areas in the concrete, and applying an epoxy floor coating.

UMAMI Ramen - Battle Creek Floor Prep

Customer

Schweitzer Construction

Completion Year

2020

Description

This was a 100-year-old building being converted into a new restaurant. In the dining area, we Diamond ground the concrete to remove all the old adhesives from the existing floor coverings. We used a large diamond grinder and went over the floor with 30 grit, filled all cracks, and patched all damage on the floor. We then continued to grind using 80 grit and 150 git diamonds to smooth the floor. Once all patching, crack filling, and grinding was done we stained the floor using an acetone concrete stain. This followed by applying a low gloss clear sealer. In the kitchen and back of the house, we performed diamond grinding, patching, and crack filling followed by applying a two-coat urethane cement coating.

Graphic Packaging - Prep

Customer

DeLoof Construction

Completion Year

2020

Description

This project was in an older section of the plant that they had removed the machinery out of the area in prep for a new line of equipment. The area had existing coatings, we used diamond grinding to remove all of the existing coatings. Once all of the old coatings were off the floor we patched and filled cracks. Then we applied a 100% solids Epoxy primer, a 100% solids Epoxy intermediate coat followed by a Polyaspartic top coat.

Warehouse Refurb - Shot Blast

Customer

Greg Schenks Professional Painting

Completion Year

2020

Description

This project was in an old factory that was being repurposed for a new business. The existing 34,000 sq. ft. had an old heavily worn urethane coating. This was removed by shot blasting, then the floor was diamond ground to a smooth surface. Lines were painted and then a concrete densifier was applied.

Nonla Burger - Grinding

Customer

AVB Construction

Completion Year

2020

Description

The project entailed the installation of a 1,000 sq ft, 7 color epoxy floor coating. Prep work included diamond grinding and shot blasting followed by epoxy coating. The topcoat was a high-ware Satin finish urethane.

Young Supply Floor – Grinding

Customer

Young Supply

Completion Year

2019

Description

The existing floor had carpet tiles that were glued down. Once the carpet tiles were pulled up the glue needed to be removed. The glue was cut/removed with our floor grinder and carbide blades. After most of the glue was removed we were able to start diamond grinding the floor for a surface profile. When grinding was complete the floor was primed with a 2-part epoxy primer, 2nd coated with a two part epoxy and flake was broadcasted into the wet material at a medium rate. The final coat was a clear 2-part urethane to protect the floor for many years.

Quincy MS/HS & Elementary Renovation & Additions – Grinding

Customer

Wolgast Corporation

Completion Year

2015

Description

Renovation and additions to Quincy Public Schools included locker rooms, a fitness area, bathrooms, and an auxiliary gymnasium. H & H Painting pressure washed and stained the exterior of the aux gym with a color band. We also installed a decorative mosaic floor system & cove base over existing ceramic tile, existing concrete & new concrete.

Jackson Western High School

Customer

Completion Year

Description

This project consisted of a gym addition. Painted graphics were included.

Big Rapids High School

Customer

Wolgast

Completion Year

2020

Description

This project consisted of a gym addition and industrial arts renovation. Painted graphics were included in the gym addition.

West Shore Community College - Manistee

Customer

Christman

Completion Year

2021

Description

This project is a complete renovation of an existing building in Manistee for West Shore Community College. The project highlights included multiple colors with metallic paint on the exposed ceiling areas.

WACO Hangar

Customer

Walbridge

Completion Year

2021

Description

This project consisted of a muli-hangar and support buildings in addition to an existing facility. It also included a complete interior and exterior renovation of the existing facility. There are many unique features to the project including a custom wallcovering mural over 100’ long and intumescent coating on the entire ceiling of one hangar.

Kalamazoo College Chapel

Customer

Miller-Davis

Completion Year

2019

Description

This complete renovation of an existing area involved intumescent painting, painting of exposed ceilings, and felt wallcoverings. One of the highlights is the rounded rooms with multiple colors of felt wallcovering floor to ceiling.