Posts in Industrial
Graphic Packaging - Prep

Customer

DeLoof Construction

Completion Year

2020

Description

This project was in an older section of the plant that they had removed the machinery out of the area in prep for a new line of equipment. The area had existing coatings, we used diamond grinding to remove all of the existing coatings. Once all of the old coatings were off the floor we patched and filled cracks. Then we applied a 100% solids Epoxy primer, a 100% solids Epoxy intermediate coat followed by a Polyaspartic top coat.

Warehouse Refurb - Shot Blast

Customer

Greg Schenks Professional Painting

Completion Year

2020

Description

This project was in an old factory that was being repurposed for a new business. The existing 34,000 sq. ft. had an old heavily worn urethane coating. This was removed by shot blasting, then the floor was diamond ground to a smooth surface. Lines were painted and then a concrete densifier was applied.

Pure Releaf - Battle Creek

Customer

Elite Companies

Completion Year

2021

Description

Pure Releaf purchased an old manufacturing facility in Battle Creek, MI. The concrete floors were in rough shape and required extensive patching and repairs before coatings could be installed.

Warehouse Refurb - Elkhart, IN

Customer

Greg Schenks Professional Painting

Completion Year

2020

Description

This project was in an old factory that was being repurposed for a new business. The existing 34,000 sq. ft. had an old heavily worn urethane coating. This was removed by shot blasting, then the floor was diamond ground to a smooth surface. Lines were painted and then a concrete densifier was applied.

JBS (Urethane Cement) - Plainwell

Customer

Schweitzer Construction

Completion Year

2020

Description

This project was the JBS feet room. The room was being refurbed and new equipment installed. The floor was prepped using diamond grinding, shot blasting, and jackhammering. The floor required heavy repair with some holes being over six inches deep. Once all prep and repair had been done we installed a 3/8 Urethane cement coating with a full broadcast of colored quartz for traction being this floor is always wet during production.

Graphic Packaging - Kalamazoo

Customer

DeLoof Construction

Completion Year

2020

Description

This project was in an older section of the plant that they had removed the machinery out of the area in prep for a new line of equipment. The area had existing coatings, we used diamond grinding to remove all of the existing coatings. Once all of the old coatings were off the floor we patched and filled cracks. Then we applied a 100% solids Epoxy primer, a 100% solids Epoxy intermediate coat followed by a Polyaspartic top coat.

Gerald R. Ford International Airport Parking Deck- Grand Rapids

Customer

Pioneer Construction

Completion Year

2015

Description

The addition of an 8 1/2 acre roof deck to the parking structure at the Gerald R Ford International Airport.  The work included sandblasting every weld on the entire structure and coating the welds with galvanized paint. All of the finished products needed to be tested by an independent agency to ensure the specified product mils were achieved.  A detailed work plan was required to make sure schedules and testing requirements were met.

Midwest Energy – Cassopolis

Customer

PARIC

Completion Year

2017

Description

This project was a new facility for Midwest Energy’s Corporate Headquarters. Included in the new facility were a two-story office, warehouse, data center, truck bay storage, and a vehicle maintenance garage with a wash bay.

Throughout the project was various finishes from the general painting to vinyl and digital wallcovering to epoxy floor coatings. A major part of the project was applying an elastomeric coating system on the entire exterior tilt-up concrete walls.