Customer
CSM Group
Completion Year
2021
Description
Painting of a new elementary school that featured multiple accent paint colors throughout the school
CSM Group
2021
Painting of a new elementary school that featured multiple accent paint colors throughout the school
O.A.K.
2021
Work entailed painting of a new 4th and 5th-grade elementary school including exposed ceilings and accent-colored walls and ceilings.
Wolgast Corporation
2015
Renovation and additions to Quincy Public Schools included locker rooms, a fitness area, bathrooms, and an auxiliary gymnasium. H & H Painting pressure washed and stained the exterior of the aux gym with a color band. We also installed a decorative mosaic floor system & cove base over existing ceramic tile, existing concrete & new concrete.
This project consisted of a gym addition. Painted graphics were included.
Wolgast
2020
This project consisted of a gym addition and industrial arts renovation. Painted graphics were included in the gym addition.
Owen Ames Kimball
2018
This renovation and addition to Kelloggsville High School included a new and existing gymnasium, a new front lobby, and renovated classrooms. The electrostatic paint process was used on existing lockers and new stair panels. There are multiple painted murals and vinyl graphic murals on the project.
Miller-Davis Company
2021
This project involved the complete renovation of the existing facility. Part of our commercial painting scope included painted graphics in the gymnasium and fitness room.
The Christman Company
2020
The scope of this project was painting a new middle school for Sparta Public Schools. Which included the layout and painting of a spartan head graphic, along with the installation of a spartan head wallcovering graphic.
Pearson Construction
2020
This project involved the commercial painting of a new athletic complex for the football stadium at Berrien Springs Schools. The project included locker rooms, concession areas, and a press box. Part of our scope of work was painted graphics on masonry walls which were challenging due to some of the small letters that were part of the graphic.
Miller Davis Company
2015
The project involved a new auxiliary gym that was constructed next to the main gymnasium of the high school complex. The project involved painting multi-color graphics on the auxiliary gymnasium walls along with painting stenciled letters for the entrances to restrooms and the main gymnasium.
Owen-Ames-Kimball
2016
Renovations and additions to Grandville Cummings Elementary in Grand Rapids included repainting of many existing areas along with four new classrooms and a new gymnasium. H & H Painting applied electrostatic paint to existing lockers and installed graphic wallcovering.
CSM Group
2015
Reconstruction and renovation project at Maple Street Magnet School for the Arts in Kalamazoo included upgrades to the gym, lobby, locker rooms, and computer lab. H & H panting helped solve existing coating failure on the ceiling and surface prep of glazed wall tile in the gym with accent colors which resulted in an outstanding reconstructed gym for KPS.
Wolgast Corporation
2015
Renovation and additions to Quincy Public Schools included locker rooms, a fitness area, bathrooms, and an auxiliary gymnasium. H & H Painting pressure washed and stained the exterior of the aux gym with a color band. We also installed a decorative mosaic floor system & cove base over existing ceramic tile, existing concrete & new concrete.
Owen Ames Kimball
2015
Addition of an athletics lobby and fitness center which involved the painting of exposed ceilings & walls, painted wall graphics, and the installation of digital/graphic wall covering.
AXIOM
2017
This project was a nice renovation and upgrade for the early childhood center school. Along with the updated finishes were gained graphics in the corridor as well as the gymnasium.
Miller Davis
2015
The project consisted of an installation of an epoxy floor coating system at the base of the bleachers in the walkway. Prep consisted of shot blasting to clean and create a profile on the floor. A prime coat of 100% solids epoxy was installed with a full broadcast of a sand aggregate. That was followed by a topcoat of 100% solids epoxy. This system created a durable, slip-resistant finish.
Wolgast
2018
H&H Painting combined services to paint the renovated office and classrooms with the new additions of music, band, multipurpose and auditorium spaces. Skilled vinyl hangers installed unique graphics and acoustical backdrops. Detailed work went into the staining and sealing of woodwork, sealing floors along with stairways, and painting the stage floor.
Miller-Davis
2018
Worked entailed painting of a newly constructed early elementary school for Kindergarten through 2nd grade. The architectural theme throughout the school was bright colors with a lot of accent colors and designs.
Mattawan Public School
2017
The project entailed sandblasting of rusted lockers in the high school boy’s locker room due to paint deteriorating and creating surface rust. Lockers were repainted with (1) intermediate coat of Macropoxy 646 and (1) topcoat of Tile Clad Gloss Epoxy to match Mattawan Blue.
Wolgast
2018
The project consisted of the installation of an epoxy floor coating system where the seats would be placed in the Auditorium. Prep consisted of shot blasting the surface to create a profile, followed by applying a 100% solids epoxy primer, and finished with a tinted urethane topcoat with iron oxide added for slip resistance.