Docks Unlimited – Floor Prep

Customer

Docks Unlimited

Completion Year

2016

Description

The project entailed shot blasting an old existing concrete floor to remove the existing coating and provide the proper profile, epoxy patching of low areas in the concrete, and applying an epoxy floor coating.

ConAgra Truck Dock Canopy – Painting Of Underside – Quincy

Customer

ConAgra Foods

Completion Year

2015

Description

A continuation of the Truck Dock Canopy project that was completed in 2014. The underside consisted of cleaning via pressure washing to remove dirt and contaminants. Followed by mechanically abrading all rusted areas. All areas were primed with a coat of high solids, rust-inhibitive, penetrating epoxy primer followed by an application of an exterior acrylic dry fall.

Bronson Healthcare Midwest Sports Medicine – Kalamazoo

Customer

Bronson Healthcare Group

Completion Year

2015

Description

The project consisted of a complete interior and exterior repaint of the facility. H & H was able to complete all work during the day and without interruption to the daily operations of the facility.

Bronson Healthcare – Fieldstone Center Renovation – Battle Creek

Customer

Bronson Healthcare Group

Completion Year

2015

Description

The project consisted of interior painting of a multi-floor renovation.

Bleistahl North America LP – Manufacturing Expansion – Battle Creek

Customer

Bleistahl North America LP

Completion Year

2015

Description

The project consisted of painting the ceiling and walls of an existing warehouse area. Prior to painting the walls and ceilings, all areas were thoroughly cleaned to remove dirt and contaminants. After protecting the floor and adjacent manufacturing areas, all painting was completed.

Bell’s Brewery Grain Handling Area – Galesburg

Customer

Bell’s Brewery

Completion Year

2013

Description

H & H Painting primed and painted carbon steel piping and structural steel within the grain handling area at Bell’s Brewery in Galesburg. The 2013 project also included color-coding piping.

Clariant Corporation – Warehouse Epoxy Line Stripping – Albion

Customer

Clariant Corporation

Completion Year

2016

Description

The project consisted of the removal of existing line stripes and the installation of new line stripes. We shot blasted the existing line stripes to remove the existing failing coating. Installed a prime coat of a polymeric amine epoxy followed by a topcoat of a high-solids polyaspartic.

Kaiser Aluminum – Maintenance Painting- Kalamazoo

Customer

Kaiser Aluminum

Completion Year

2015

Description

This project consisted of general maintenance painting throughout a facility. All areas had to be thoroughly cleaned and painted. The work was completed during a shutdown and during operating hours. All of the work completed during operating hours was able to be completed without any disruption.

Marshall Fire Station- Apparatus Bay Epoxy Line Striping – Marshall

Customer

Clark Construction Company

Completion Year

2015

Description

This project consisted of a newly constructed fire station. The fire truck apparatus bays required a new layout of line stripes. The new concrete floor was first shot blasted to create a profile of where the line stripes were to be installed. The line stripes were then painted with a high-solids polyamide epoxy.

Mol-Son Tool Shop Addition / Renovation

Customer

Mol-Son

Completion Year

2017

Description

The addition of a new 9610 sq./ft tool shop expansion along with the renovation of the existing tool shop area. The project involved painting exposed ceilings and ductwork, walls, and steel columns. The walls included a painted wainscot lower section to match the existing color scheme of the existing facility. Also shot blasting existing concrete floor, patching, and applying a 3 coat epoxy/urethane floor coating system to the new and existing shop area.

Wings Event Center – Locker Rooms & Tunnels

Customer

CSM Group

Completion Year

2016

Description

This project incorporated many renovated areas of the event center, mainly the locker rooms and the arena entrance tunnels. The scope of work included an epoxy floor coating in the player’s entrance stairwell. Prepping old walls prior to painting, and painting exposed ceilings throughout the weight room and visitor locker rooms. This project had to be closely managed daily for planning and scheduling work around the events taking place with the hockey team’s practice and game schedule.

Docks Unlimited – Epoxy Floor – Portage

Customer

Docks Unlimited

Completion Year

2016

Description

The project entailed shot blasting an old existing concrete floor to remove the existing coating and provide the proper profile, epoxy patching of low areas in the concrete, and applying an epoxy floor coating.

Dunshee Body & Frame – Exterior Painting – Kalamazoo

Customer

Dunshee Body & Frame, Inc.

Completion Year

2016

Description

The project entailed cleaning and repainting exterior EIFs and bumper post on the exterior of the existing office area.

Mattawan High School Boys Athletic Lockers

Customer

Mattawan Public School

Completion Year

2017

Description

The project entailed sandblasting of rusted lockers in the high school boy’s locker room due to paint deteriorating and creating surface rust. Lockers were repainted with (1) intermediate coat of Macropoxy 646 and (1) topcoat of Tile Clad Gloss Epoxy to match Mattawan Blue.

Schenk's Painting - Elkhart, IN

Customer

Schenk’s Professional Painting

Completion Year

2020

Description

Refurbish concrete floor in a 36,000 Sq ft commercial building. Prep work included shot-blasting and diamond grinding to remove the existing coating. Then we installed epoxy striping followed by a concrete sealer/densifier.