Clariant Corporation – Warehouse Epoxy Line Stripping – Albion

Customer

Clariant Corporation

Completion Year

2016

Description

The project consisted of the removal of existing line stripes and the installation of new line stripes. We shot blasted the existing line stripes to remove the existing failing coating. Installed a prime coat of a polymeric amine epoxy followed by a topcoat of a high-solids polyaspartic.

More projects
Kaiser Aluminum – Maintenance Painting- Kalamazoo

Customer

Kaiser Aluminum

Completion Year

2015

Description

This project consisted of general maintenance painting throughout a facility. All areas had to be thoroughly cleaned and painted. The work was completed during a shutdown and during operating hours. All of the work completed during operating hours was able to be completed without any disruption.

More projects
Marshall Fire Station- Apparatus Bay Epoxy Line Striping – Marshall

Customer

Clark Construction Company

Completion Year

2015

Description

This project consisted of a newly constructed fire station. The fire truck apparatus bays required a new layout of line stripes. The new concrete floor was first shot blasted to create a profile of where the line stripes were to be installed. The line stripes were then painted with a high-solids polyamide epoxy.

More projects
Grand Ledge Delta Mills ECC – Grand Ledge

Customer

AXIOM

Completion Year

2017

Description

This project was a nice renovation and upgrade for the early childhood center school. Along with the updated finishes were gained graphics in the corridor as well as the gymnasium.

More projects
20 Fulton- Grand Rapids

Customer

Pioneer Construction

Completion Year

2017

Description

This project was a challenging 12 story apartment complex and an attached 3 story parking garage with a roof deck pool. A compressed schedule and high demand for manpower were the biggest obstacles we overcame to complete this high-rise on time for our client.

Included in the project was the painting of drywall walls & ceilings, concrete ceilings, wood doors & trim, and metal doors and frames. The finishing of all these various substrates resulted in a great-looking high-end apartment building for downtown Grand Rapids.

More projects
Midwest Energy – Cassopolis

Customer

PARIC

Completion Year

2017

Description

This project was a new facility for Midwest Energy’s Corporate Headquarters. Included in the new facility were a two-story office, warehouse, data center, truck bay storage, and a vehicle maintenance garage with a wash bay.

Throughout the project was various finishes from the general painting to vinyl and digital wallcovering to epoxy floor coatings. A major part of the project was applying an elastomeric coating system on the entire exterior tilt-up concrete walls.

More projects
Consumers Credit Union Headquarters – Kalamazoo

Customer

AVB Construction

Completion Year

2017

Description

The project entailed painting and application of high-performance coatings on a new 92,000 sq. ft. three-story facility.

More projects
Mol-Son Tool Shop Addition / Renovation

Customer

Mol-Son

Completion Year

2017

Description

The addition of a new 9610 sq./ft tool shop expansion along with the renovation of the existing tool shop area. The project involved painting exposed ceilings and ductwork, walls, and steel columns. The walls included a painted wainscot lower section to match the existing color scheme of the existing facility. Also shot blasting existing concrete floor, patching, and applying a 3 coat epoxy/urethane floor coating system to the new and existing shop area.

More projects
Brembo Foundry

Customer

The Christman Company

Completion Year

2016

Description

A new state-of-the-art cast iron foundry. Construction included 200,000 sq. ft. of production, 40,000 sq. ft. of warehouse, 18,000 sq. ft. of new office space, and various support buildings. Work included painting walls, all structural steel, color coding pipes, and column identification all completed within a challenging 14-month schedule.

More projects
Wings Event Center – Locker Rooms & Tunnels

Customer

CSM Group

Completion Year

2016

Description

This project incorporated many renovated areas of the event center, mainly the locker rooms and the arena entrance tunnels. The scope of work included an epoxy floor coating in the player’s entrance stairwell. Prepping old walls prior to painting, and painting exposed ceilings throughout the weight room and visitor locker rooms. This project had to be closely managed daily for planning and scheduling work around the events taking place with the hockey team’s practice and game schedule.

More projects
Delton Kellogg High School – Bleacher Walkway Epoxy Floor – Delton

Customer

Miller Davis

Completion Year

2015

Description

The project consisted of an installation of an epoxy floor coating system at the base of the bleachers in the walkway. Prep consisted of shot blasting to clean and create a profile on the floor. A prime coat of 100% solids epoxy was installed with a full broadcast of a sand aggregate. That was followed by a topcoat of 100% solids epoxy. This system created a durable, slip-resistant finish.

More projects
Docks Unlimited – Epoxy Floor – Portage

Customer

Docks Unlimited

Completion Year

2016

Description

The project entailed shot blasting an old existing concrete floor to remove the existing coating and provide the proper profile, epoxy patching of low areas in the concrete, and applying an epoxy floor coating.

More projects
Victory Life Church – Battle Creek

Customer

Pioneer

Completion Year

2017

Description

The project entailed painting a new addition to the existing church including a new worship area.

More projects
Airview Center Renovation – Portage

Customer

AVB

Completion Year

2019

Description

H&H Painting’s own staff certified 3M DI-NOC installer prepped and wrapped elevator doors and frames with a metallic finish to complete the transformed lobby renovation.

More projects
Hastings High School Renovation & Addition – Hastings

Customer

Wolgast

Completion Year

2018

Description

H&H Painting combined services to paint the renovated office and classrooms with the new additions of music, band, multipurpose and auditorium spaces. Skilled vinyl hangers installed unique graphics and acoustical backdrops. Detailed work went into the staining and sealing of woodwork, sealing floors along with stairways, and painting the stage floor.

More projects
MSU Cook Hall Renovation – East Lansing

Customer

The Christman Company

Completion Year

2018

Description

H&H Painting delicately stripped existing old finishes on wood doors, wainscot stairs, and trim in the existing facility. Followed by staining and varnishing all new and existing wood combined with the detailed painting of multiple substrates resulted in a wonderfully uniform historic renovation on MSU’s campus.

More projects
Young Supply Floor – Kalamazoo

Customer

Young Supply

Completion Year

2019

Description

The existing floor had carpet tiles that were glued down. Once the carpet tiles were pulled up the glue needed to be removed. The glue was cut/removed with our floor grinder and carbide blades. After most of the glue was removed we were able to start diamond grinding the floor for a surface profile. When grinding was complete the floor was primed with a 2-part epoxy primer, 2nd coated with a two part epoxy and flake was broadcasted into the wet material at a medium rate. The final coat was a clear 2-part urethane to protect the floor for many years.

More projects
Mattawan New Early Elementary

Customer

Miller-Davis

Completion Year

2018

Description

Worked entailed painting of a newly constructed early elementary school for Kindergarten through 2nd grade. The architectural theme throughout the school was bright colors with a lot of accent colors and designs.

More projects
Dunshee Body & Frame – Exterior Painting – Kalamazoo

Customer

Dunshee Body & Frame, Inc.

Completion Year

2016

Description

The project entailed cleaning and repainting exterior EIFs and bumper post on the exterior of the existing office area.

More projects
Mattawan High School Boys Athletic Lockers

Customer

Mattawan Public School

Completion Year

2017

Description

The project entailed sandblasting of rusted lockers in the high school boy’s locker room due to paint deteriorating and creating surface rust. Lockers were repainted with (1) intermediate coat of Macropoxy 646 and (1) topcoat of Tile Clad Gloss Epoxy to match Mattawan Blue.

More projects